Beth's Place

Friday, September 23, 2005

Tuesday 9/20

Today was the start of the mechanical phase of the construction. We now have both a furnace and plumbing.

posted by Beth at 11:59 AM

0 Comments:

Post a Comment

<< Home

Previous Posts

  • Tar paper on the roof. I wonder when we will get ...
  • A furnace! The water heater will sit next to it. 
  • Some of this heads upstairs and some downstairs. 
  • Even the fireplace is used to run pipes and ducting 
  • Laundry hookup 
  • Just a hint of all the pipes now running through t...
  • Master tub 
  • Master shower 
  • Ducting all over the place.  
  • The large hole in the floor is the cold air return...

Contributors

  • Beth
  • Draconis Rex

Powered by Blogger